Today, I was taught to design pile cap using truss method. There are limitation for truss method, where the number of pile used should not exceed 6 piles. Example and equation was provided to ease my learning process. Pile cap design for 2P400 was completed on the day.
Beam bending theory was taught to analyse pile cap that has more than 6 piles. Two examples were provided as reference. The first example was on pilecap design 7P300. The second example was on pilecap design 6P300. Both design and analysis was completed on the day.
An example of pilecap